Water & Sanitation (SBC 701)

Water, drainage and sanitation networks built to SBC 701

Hydraulic design for domestic water supply, separated greywater/sewage lines, structural tank sizing, and Riyadh flash-stormwater drainage compliant with SBC 701 and National Water Company (NWC) tie-in rules.

Site infrastructure and landscape irrigation network in Riyadh
Regulatory Compliance MOMRA & Balady Saudi Council of Engineers (SCE) RCRC Guidelines Saudi Building Code (SBC)

Scope of engineering deliverables

Potable Water & Underground Tank Sizing

Daily demand calculations, booster pump head sizing, roof-tank staging, and structural/waterproofing detailing for underground cisterns.

  • NWC meter connection coordination
  • Hot/cold PPR & PEX riser balancing
  • Backflow prevention & tank disinfection isolation

Sanitary Drainage & Vent Stacks

Self-cleansing pipe gradients, dual-vented stacks preventing trap siphonage, and inspection chamber layout to street manholes.

  • Separated grease/oil traps for commercial kitchens
  • Cleanout access & acoustic riser insulation
  • Septic/holding tank design where mains lack

Stormwater & Drip Irrigation Reuse

Roof scupper sizing, courtyard linear trench drains, and optional greywater filtration integrated with drought-tolerant Green Riyadh landscaping.

  • 100-year peak rainfall roof drain safety
  • Perimeter grading away from foundation slabs
  • Automated drip irrigation tie-ins

SBC 701 Plumbing Design Priorities

Phase / CodeTechnical DeliverableApproval Impact
Dual Venting SystemDedicated vent stacks preserving fixture water sealsEliminates indoor sewer odors
Pipe Gradient ControlCalculated minimum velocity slopes per pipe diameterPrevents blockages & solids settling
Underground Cistern SeparationMinimum clearance from boundary sewers & waterproofing specsProtects drinking water hygiene

Frequently asked questions

How is underground water tank capacity calculated for Riyadh villas or complexes?
Capacity is sized per occupant fixture units (under SBC 701) plus a municipal supply reserve buffer (typically 3–5 days of domestic demand plus fire reserve where applicable).
Can greywater be safely reused for Riyadh villa landscape irrigation?
Yes, provided separate shower/basin drain lines route to a compact filtration unit with chlorine/UV dosing separated completely from blackwater sewage lines.

Need a fixed-scope proposal for Water & Wastewater Networks?

Share your site masterplan or building utility demand below or via WhatsApp for an SBC 701 water and drainage engineering proposal.

Message SA'F on WhatsApp