Structural Engineering

Structural engineering built on geotechnical precision

Code-compliant concrete and steel structural design calibrated to soil bearing capacity, Saudi seismic zones (SBC 301/304), and contractor constructability without excessive steel tonnage.

Structural engineering masterplan coordination in Riyadh
Regulatory Compliance MOMRA & Balady Saudi Council of Engineers (SCE) RCRC Guidelines Saudi Building Code (SBC)

Scope of engineering deliverables

Geotechnical Study Integration

Evaluating Riyadh borehole soil reports (SBC 303) to choose optimal isolated footings, strip foundations, raft slabs, or rock anchors.

  • Bearing capacity & settlement review
  • Groundwater & sulfate concrete grade spec
  • Basement retaining wall & shoring plans

Structural Framing & Rebar Detailing

Finite-element structural modeling for reinforced concrete villas, commercial spans, and pre-engineered steel industrial bays.

  • Slab system optimization (flat, hollow-block, post-tension)
  • Clear rebar bending schedules & splice notes
  • Deflection & seismic drift verification

MEP Sleeve & Penetration Coordination

Early structural-MEP coordination eliminating slab cutting and core-drilling on site during electromechanical installation.

  • Pre-allocated riser shafts & AC sleeves
  • Balanced beam depths above concealed ducts
  • Review of existing contractor structural shop drawings

Key Structural Design Codes Applied

Phase / CodeTechnical DeliverableApproval Impact
SBC 301Structural Loads and Forces (dead, live, wind, and seismic loads)All building classes in KSA
SBC 303Soils and Foundations (borehole bearing verification & basement design)Mandatory pre-permit soil report check
SBC 304Concrete Structures (ductility, cover, and mix specifications)Concrete villas, towers & commercial buildings

Frequently asked questions

Can SA'F review an existing structural plan to reduce steel waste?
Yes. We provide structural value engineering audits to verify slab efficiency, column grid spans, and rebar ratios while preserving full safety factors under SBC 304.
Is a soil test mandatory before starting foundation design?
Under SBC 303 and Balady permitting rules, borehole soil testing is required for residential villas and commercial buildings so foundation depth and type match actual subsurface rock or soil strata.