Engineering Supervision

Field engineering supervision from excavation to occupancy

Accredited site engineers executing mandatory Balady & Inherent Defects Insurance (IDI) inspection milestones — ensuring contractor steel placement, concrete pours, waterproofing, and thermal insulation match stamped drawings.

Quality control and architectural site inspection in Riyadh
Regulatory Compliance MOMRA & Balady Saudi Council of Engineers (SCE) RCRC Guidelines Saudi Building Code (SBC)

Scope of engineering deliverables

Structural & Concrete Milestones

Site inspection and digital sign-off before every structural pour: soil bearing level, blinding, footings, tie-beams, columns, and slabs.

  • Rebar diameter, spacing & concrete cover checks
  • Formwork bracing & plumb verification
  • Concrete cube testing & slump tracking

SBC 602 Envelope & MEP First-Fix

Verifying continuous thermal insulation panels, waterproofing membranes, pressurized plumbing tests, and conduit protection before closing walls.

  • Thermal bridge & insulated block checks
  • Hydrostatic water-test verification in wet areas
  • HVAC drain slope & pressure testing

Balady & IDI Stage Reporting

Uploading timestamped field inspection certificates on Balady to keep municipal permit validity intact and authorize utility connections.

  • Electronic SCE/Balady stage compliance
  • Non-conformance technical notices to contractor
  • Final completion dossier for Occupancy Certificate

Mandatory Supervision Inspection Stages

Phase / CodeTechnical DeliverableApproval Impact
Stage 1 — Site & ExcavationSubgrade soil verification matched against geotechnical bearing strataPrior to blinding concrete
Stage 2 — Foundations & ColumnsFooting, ground beam & vertical rebar sign-off before every pourEnables IDI inspector clearance
Stage 3 — Envelope & FinishingSBC 602 insulation, glazing specs & final architectural alignmentRequired for Completion Certificate

Frequently asked questions

Is an engineering supervision contract mandatory for residential villas in Riyadh?
Yes. Under Balady regulations and Inherent Defects Insurance (IDI) rules, a licensed engineering supervision contract is mandatory to register the building permit and upload verified construction stages for permanent electricity connection.
What is the difference between the Designer Office and the Supervising Office?
The Designer produces and stamps the architectural, structural, and MEP construction drawings; the Supervising Office independently verifies on site that the contractor builds in compliance with those drawings and the Saudi Building Code.