Safe electrical systems aligned with SBC 401 & SEC
Detailed electrical load schedules, main/sub distribution boards, energy-efficient architectural lighting, and low-current building systems ready for Saudi Electricity Company (SEC) and municipal approvals.
Scope of engineering deliverables
Power Distribution & SEC Coordination
Demand factor calculations, main distribution boards (MDBs), breaker coordination, and SEC substation/meter room allocations.
- Voltage drop & short-circuit calculations
- Load balancing across three-phase panels
- EV charger & solar PV feeder readiness
Architectural Lighting & SBC 602
Task and ambient lighting layouts maintaining strict Watts-per-sqm energy limits under SBC 602 without under-lighting key spaces.
- DALI / smart dimming scene grouping
- Exterior facade & landscape IP65 circuits
- Emergency & exit lighting for commercial projects
Low-Current, Fire Alarm & Security
Integrated fiber backbone, structured CAT6A data, CCTV coverage, access control, and Civil Defense fire detection wiring.
- KNX / smart automation bus routing
- Voice/data racks & Wi-Fi AP ceiling drops
- Addressable fire alarm loop drawings
Electrical Design Checklist Before Construction
| Phase / Code | Technical Deliverable | Approval Impact |
|---|---|---|
| Power Load Schedule | Balanced phases, spare breaker capacity, and SEC connection kVA rating | Prevents panel tripping & utility delays |
| SBC 602 Energy Audit | High-efficacy LED fixture schedule & occupancy sensor zones | Mandatory for municipal permit approval |
| Low-Current Integration | Dedicated conduits separated from high-voltage feeds | Zero electromagnetic interference |
Frequently asked questions
Do your electrical packages satisfy Saudi Electricity Company (SEC) requirements?
Can smart home automation be integrated at design stage?
Need a fixed-scope proposal for Electrical Engineering?
Share your building load brief or architectural floor plans below or via WhatsApp for an SBC 401 electrical design proposal.
Message SA'F on WhatsApp