Building Permits (Balady)

Fast, compliant Balady permitting from survey to occupancy

As an accredited Saudi engineering office on the Balady and MOMRA platforms, SA'F manages residential, commercial, and mixed-use permit filings, drawing revisions, and final completion certificates.

Municipal building permits and masterplan approvals in Riyadh
Regulatory Compliance MOMRA & Balady Saudi Council of Engineers (SCE) RCRC Guidelines Saudi Building Code (SBC)

Scope of engineering deliverables

New Construction & Fencing Permits

Full Balady submission once survey decision, soil report, architectural/MEP/structural packages, and IDI prerequisites align.

  • Residential villas & apartment blocks
  • Commercial showrooms & strip malls
  • Temporary or permanent plot fencing permits

Amendments, Renovation & Regularization

Updating approved municipal permits for layout changes, structural additions, demolition, or existing building compliance.

  • Permit renewal & modified drawing upload
  • Renovation & interior commercial fit-out permits
  • Corrective as-built verification for older assets

Completion & Compliance Certificates

Final technical closing files enabling Saudi Electricity Company (SEC) power connection and municipal corridor compliance.

  • Occupancy / Building Completion Certificate
  • Main-corridor Building Compliance Certificate
  • Coordinated SCE supervision sign-off

Core Permit Pathways Handled via Balady

Phase / CodeTechnical DeliverableApproval Impact
New Building PermitRequires electronic deed, survey decision, soil report & stamped SBC design packageAuthorized construction start
Building Completion CertificateRequires field supervision reports matching stamped municipal plansRequired for SEC permanent power tie-in
Compliance CertificateVerifies exterior facade, lighting, signage & absence of street encroachmentsMandatory along Riyadh main arteries

Frequently asked questions

What is the difference between a Building Completion Certificate and a Compliance Certificate?
The Completion Certificate (Occupancy) confirms construction followed the permitted structural, architectural, and SBC drawings and authorizes utility connections. The Building Compliance Certificate specifically certifies exterior compliance (facades, setbacks, signage) for existing properties on major corridors.
What commonly delays Balady permit approvals?
Mismatches between the cadastral survey decision and the electronic deed, incomplete SBC 602 thermal envelope documentation, or missing Inherent Defects Insurance (IDI) coordination.

Need a fixed-scope proposal for Balady Building Permits?

Share your electronic deed status and Riyadh plot details below or via WhatsApp so our permitting team can map your Balady workflow.

Message SA'F on WhatsApp